4 meter Plank - Build thread

thenated0g

Drinker of coffee, Maker of things
Mentor
Been slowly sanding/filling the transition on the tail.
IMG_20200713_182459.jpg IMG_20200712_213317.jpg

Last servo about to go in the wing.
IMG_20200712_212847.jpg IMG_20200712_212856.jpg

And started working on the wing saddle that will get epoxied to the fuselage.
IMG_20200713_185944.jpg IMG_20200714_065108.jpg IMG_20200713_201135.jpg IMG_20200713_202500.jpg IMG_20200714_065133.jpg IMG_20200714_065415.jpg IMG_20200714_065808.jpg IMG_20200714_070618.jpg IMG_20200714_070635.jpg
 

thenated0g

Drinker of coffee, Maker of things
Mentor

Few things done this weekend.
Left side wiring all done, see video above. One thing i gotta say about these $40 servos they are FAST. And this is only on 6v. On 8.4 they must be nuts.
IMG_20200719_151024.jpg IMG_20200719_151145.jpg

Heres how the fuselage looks with wing mount holes:
IMG_20200720_070157.jpg

And the threaded holes in the left wing.
IMG_20200720_070214.jpg

Right side electronics is about 15 minutes from being done.
After that i just need to remeasure dimensions to recheck CG. Based off all my previous DIY builds i am going to guess that while there are differences from my original plans the change to estimated cg will be minimal, but always, if for nothing than else than peace of mind, i like to recheck everything.

And than i can put the plane all together and see how much weight i need in the nose. Based off needed weight i will either use 2x 26800's or 2x 18650's in 2s configuration. That would be 230g vs 100g.
 

thenated0g

Drinker of coffee, Maker of things
Mentor
Finally got all the wiring done. Couple few cosmetic stuff to do but close enough to start working on cg and electronics in the fuse.
IMG_20200720_202143.jpg IMG_20200720_202133.jpg
IMG_20200720_202047.jpg IMG_20200720_202042.jpg IMG_20200720_202053.jpg

Dropped in 110g of lead and epoxy. Heres those 28600's for size.
IMG_20200720_203446.jpg IMG_20200720_203627.jpg