Ready to go
Well the flights will be done with gear down only.
We confirmed the retract circuit board is done.
The main controller chip overheats.
So set the gear to the down position and removed the electronics.
Setup the CG and finished off all the checks.
I still need to do some tweaks on the radio.
Well the flights will be done with gear down only.
We confirmed the retract circuit board is done.
The main controller chip overheats.
So set the gear to the down position and removed the electronics.
Setup the CG and finished off all the checks.
I still need to do some tweaks on the radio.