TooJung2Die
Master member
Ready to Maiden
She's ready for her beauty shots before the maiden flight. Rigging is braided fishing line. The windshield in the plans didn't look anything like the ones on a real SE5a. This one looks more scale. The whole airplane got two coats of 50/50 Eze Dope brushed over the decals. Two months to build almost exactly to the day. Seems longer. The hands will be shakin' during the first flight.
The weather today is miserable. The weekend looks to be no better. Here's hoping the next post has a flight video before too long.
jon
She's ready for her beauty shots before the maiden flight. Rigging is braided fishing line. The windshield in the plans didn't look anything like the ones on a real SE5a. This one looks more scale. The whole airplane got two coats of 50/50 Eze Dope brushed over the decals. Two months to build almost exactly to the day. Seems longer. The hands will be shakin' during the first flight.
The weather today is miserable. The weekend looks to be no better. Here's hoping the next post has a flight video before too long.
jon
Last edited: