Finally something to mention on this build! Nothing major, but an update is an update. Back in late December I sent a check for the L-19 cowl and the plans for the T-28 (gotta have more planes in line for construction!). A new job and life in general got in the way of building and I forgot about the order until a few weeks ago when I realized I didn't get the cowl yet.
So I called a few weeks ago and was told that the check must have never arrived or the cowl & plans would have been sent out. I decided to skip plans for the T-28 and instead get the L-19 cowl and plans for the Microwave (see pics), and sent another check. Again I forgot about it again until today, when I called to see if check #2 arrived. I was promised a call back once they looked into it. When I got home from work today, a box was waiting for me. I figured it was order #2, but turns out it was order #1!
Weird timing, and a bit annoying having to wait just over 3 months for a simple order to arrive... I'll probably let Order #2 go as planned so I have a second L-19 cowl. The Microwave would probably go into the build order before the T-28, but there are other planes also waiting patiently to be built. Eventually...!
So I called a few weeks ago and was told that the check must have never arrived or the cowl & plans would have been sent out. I decided to skip plans for the T-28 and instead get the L-19 cowl and plans for the Microwave (see pics), and sent another check. Again I forgot about it again until today, when I called to see if check #2 arrived. I was promised a call back once they looked into it. When I got home from work today, a box was waiting for me. I figured it was order #2, but turns out it was order #1!
Weird timing, and a bit annoying having to wait just over 3 months for a simple order to arrive... I'll probably let Order #2 go as planned so I have a second L-19 cowl. The Microwave would probably go into the build order before the T-28, but there are other planes also waiting patiently to be built. Eventually...!