L84DNR
Junior Member
As I'm waiting for the remaining parts from HK for my first quad I have spent the time trying to gather as much info as I can.
The motor I chose is a bell style with a threaded shaft, comes with two nylon lock nuts and two washers. My question is when assembling this with a prop how far down should the first nut go and how tight should the two nuts squeeze the prop? Is this a lite proposition or wrench the damn thing down as hard as you can?
Any insight on the correct way to mount a propeller on this type of motor would be appreciated!
The motor I chose is a bell style with a threaded shaft, comes with two nylon lock nuts and two washers. My question is when assembling this with a prop how far down should the first nut go and how tight should the two nuts squeeze the prop? Is this a lite proposition or wrench the damn thing down as hard as you can?
Any insight on the correct way to mount a propeller on this type of motor would be appreciated!