I need to work a bit more in the central part. Must add the screws to fix the wing to the fuselaje. The uper servo in the picture will controll the ailerons, and the other servo will controll flaps. View attachment 158412View attachment 158433View attachment 158434
Take a look to this. Both servos are goin to be on the bottom of the central wing section, so they will be hidden inside de fuselaje once the wing is attached.
Take a look to this. Both servos are goin to be on the bottom of the central wing section, so they will be hidden inside de fuselaje once the wing is attached. View attachment 158546
Yes!!! it was a bit complicate to achive because i couldn;t find long tubes with the correct inner diameter so i had to use those:
what a pain.... to place those toguether.... one by one
But this way i can control aileron and flaps only using 2 servos, instead using 4 servos. (i am really short of that)
I can't wait neither . I'm stuck with the installation of the lights. Until I finish the circuit I can't finish covering the fuselage, and therefore... no maiden flight.
I can't wait neither . I'm stuck with the installation of the lights. Until I finish the circuit I can't finish covering the fuselage, and therefore... no maiden flight.