While Joe did that, I worked on the finishing touches of build #1.
This is the box in a box design for strength.
motors got mounted to sturdy firewalls to fit over the center box
mounter to yet a 3rd yet smaller box. It is very important the front edge had the same angle as the front of the fuse.
then we put all the things together and weighed them. 10lbs AUW.
It's tough to find a spot to assemble this!
The ESC was recommended to be out side so it get cooling air.
And let's put the battery in snug
the logo looks good
Then we packed it up and in caravan fashion, Joe, Amy, Mike (
@Yankee2003 ) and I hit the field, Ready for the maiden.