Bricks
Master member
To make the hinge lines easier for the servos to move what needs to be done before the build is, take all the control surfaces fold them back over themselves, put weight on them so they stay flat and let it sit over night. For EPP this is one of the better ways to loosen them up.
Those links do not take much for heat to melt them, depending I will use my solder gun to shrink the tubing then still CA them.
Those links do not take much for heat to melt them, depending I will use my solder gun to shrink the tubing then still CA them.