Got everything ready last night:
I was able to get the other wing bagged this morning.
Took me about one hour of Indiana Jones to get it done. One thing about it being summer, its way easier to keep the shop above 80 for the epoxy. Will keep it under pressure for 12 hrs and than let it sit in the mylars and open it up tomorrow night.
Got some work done on my Zippkit Tug while waiting for epoxy to set: